Gold Member Since 2010
Audited Supplier
Shandong Minglong Construction Machinery Co., Ltd.

Construction Machinery, Crane, Machinery manufacturer / supplier in China, offering Inside Climbing Tower Crane Qnp20, Hot Sale China Construction Crane Qtz50 (5008) Max. Load 4t, Construction Lifting Equipment Tower Cranes Qtz80 (5516) and so on.

(/ )

Supplier Homepage Product Inner climbing tower crane Inside Climbing Tower Crane Qnp20

Inside Climbing Tower Crane Qnp20

FOB Price: US $100,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $100,000/ Piece
Get Latest Price
Production Capacity: 100 Sets/Month
Transport Package: Sea Worthy Package in Container
Payment Terms: L/C, T/T, Western Union
Basic Info
  • Model NO.: QNP20
  • Condition: New
  • Moving Type: Fixed
  • Model: Qnp20
  • Max Height: 150m
  • Tip Load: 0.65t
  • Power: 220V 50Hz
  • Material: 135X135X12, Q345b Angle Steel
  • Application: Construction Usage
  • Sling Type: Wire Rope
  • Main Girder Form: Double Girder
  • Specification: ISO9001, CE
  • HS Code: 8426200
  • Certification: CE, ISO9001: 2000
  • Installation: Assembled
  • Type: Tower Crane
  • Free Standing Height: 19.5m
  • Max Load: 2t
  • Jib Length: 30m
  • Mast Section: 1.835X1.835X2.5m
  • Color: Yellow Red
  • Power Source: Hydraulic
  • Tower Crane Type: Slewing Tower Crane
  • Trademark: Minglong
  • Origin: China
Product Description

Product Description:
QNP20 inner climbing tower crane: 
Max. Load: 2t 
Tip load: 0.65t 
Jib length: 30m 
Free standing height: 19.8m 
Inner climbing tower crane jacking 
Inner climbing tower crane has three attached frames, from down to up respectively are load bearing attached frame, antirotation attached frame and transition attached frame. The distance between two adjacent attached frames is nine to twelve meters, three attached frames all are on the girder Steel, and they connect with the girder Steel by bolts. The girder Steel is put on the concrete beam of core tube elevator hoistway, and they connect with each other by bolts to assure that connection of girder steel and building structure is reliable. All attached frames can be dismantled to assure the cycle use and function conversion. Load bearing attached frame is mainly to bear the vertical-down acting force generating in every kind of working condition. Antirotation attached frame is mainly to bear the torsional moment and bending moment generating in every kind of working condition, and serve as the climbing pathway in the process of climbing and at last it serves as antirotation attached frame. Tower crane only uses load bearing attached frame and antirotation attached frame to fix tower body in normal working condition, but before climbing we need to install the third attached frame to serve as transition attached frame, so as to assure the reliability of climbing track. Climbing height is the distance between load bearing attached frame and antirotation attached frame. 

1\Fix two pieces of ready-made girder steel to concrete beam of building's core tube by sixteen bolts, then install strengthen attached frame on the girder steel and adjust the gap between guide pulley and tower body(generally two to five millimeters). Note: The armoured concrete beam of building must be designed by designing institute and up to the requirement of bearing capacity. 
2\Fix the jib in the direction of vertical to climbing crossbeam and adjust the range of trolley to make the barycenter of tower crane pass jacking oil cylinder. 

3\Put the claw hand of inner climbing jacking crossbeam on inner climbing pathway, raise the tower body up, and put claw hand of inner climbing base section on vertical position. Figure (1); Put the claw hand of inner climbing base section level, limiting tower body sliding down, draw back jacking oil cylinder. Figure (2); After jacking oil cylinder is drawn back, put the claw hand of inner climbing jacking beam level, and put the claw hand of inner climbing base section vertical. Figure (3); Repeat it again and again to make tower body rise as desired requirement. Figure (4). When tower crane rises to desired height, lay two load bearing support square beams under the channel steel of inner climbing base section, let them bear the weight of tower crane.

Inside Climbing Tower Crane Qnp20
Technique parameter:

Rated  lifting  moment
KN· M200
Max  lifting  weightt2
Working  radiusm2.5-30
Hoisting  heightIndependencem25.6
Hoisting  speedTwo  maganificationm/min26.4/6.3
Four  maganification
Slewing  speedr/min0.76/0.38
Trolleying  speedm/min22.5
Jacking  speed
Mini  steady  falling  speed< 7
Outside
dimension
of  whole
crane
Chassism3.847× 3.847
The  height  of  craneIndependence35
Attachment
From  boom  end  to  slewing  center
From  tail  of  balance  arm  to  slewing  center8.4
The  whole  weightStructure  weightIndependencet10.838
Attachment
Balanced  weight3.470
The  total  volume  of  electric  motorkw15.6
Allowed  working  temperatureDegree-20~+40
The  index  of  power  supply60Hz~380V± 10%
Inside Climbing Tower Crane Qnp20
Send your message to this supplier
Avatar
Ms. Nicole Miao
Sales Manager
*From:
To: Ms. Nicole Miao
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now